Demo begins.
We decide to tackle the master bedroom floor.
1. Rip up old carpet, pad, and tack strips
2. Remove baseboards
3. Prepare subfloor for new cork planks
4. Simple!
… but wait, what is that over there?
Mold??? YUCK! Don’t touch it!!!
We hurry home, shower and wash all of our clothes.
I’m calling a contractor today.
You really have gotta love the flat roofs…
apparently they fixed the roof, but did not repair the damage inside. Nice.
(I think I have a tickle in my throat.)